1. Scope
1.1 General Application
1.2 Special Applications
1.3 Fitness-For-Service and Risk-based Inspection
1.1 General Application
1.2 Special Applications
1.3 Fitness-For-Service and Risk-based Inspection
-
Reference standard and detail.
-
Reference standard and detail.
-
4. Owner-Operator Inspection Organization
4.1 General
4.2 Authorized Piping Inspector Qualification and Certification
4.3 Responsibilities
4.1 General
4.2 Authorized Piping Inspector Qualification and Certification
4.3 Responsibilities
-
6. Interval/Frequency and Extent of Inspection
6.1 General
6.2 Inspection during Installation and Service Changes
6.3 Piping Inspection Planning
6.4 Extent of Visual External and CUI Inspections
6.5 Extent of Thickness Measurement Inspection and Data Analysis
6.6 Extent of Inspections on SBP, Deadlegs, Auxiliary Piping, and Threaded Connections
6.7 Inspection and Maintenance of PRDs
6.1 General
6.2 Inspection during Installation and Service Changes
6.3 Piping Inspection Planning
6.4 Extent of Visual External and CUI Inspections
6.5 Extent of Thickness Measurement Inspection and Data Analysis
6.6 Extent of Inspections on SBP, Deadlegs, Auxiliary Piping, and Threaded Connections
6.7 Inspection and Maintenance of PRDs
-
7. Inspection Data Evaluation, Analysis, and Recording
7.1 Corrosion Rate
7.2 Remaining Life Calculations
7.3 Newly Installed Piping Systems
7.4 Existing and Replace Piping
7.5 MAWP
7.6 Required Thickness
7.7 Assessment of Inspection Findings
7.8 Piping Stress Analysis
7.9 Reporting and Records for Inspect
7.10 Inspection Recoment for Repair or Replace
7.11 Inspection Records for External Inspections
7.12 Piping Failure and Near-miss Reports
7.13 Deferral of Inspections, Tests, and Exam
7.14 Deferral of Inspect Repair Recommend Due Dates
7.1 Corrosion Rate
7.2 Remaining Life Calculations
7.3 Newly Installed Piping Systems
7.4 Existing and Replace Piping
7.5 MAWP
7.6 Required Thickness
7.7 Assessment of Inspection Findings
7.8 Piping Stress Analysis
7.9 Reporting and Records for Inspect
7.10 Inspection Recoment for Repair or Replace
7.11 Inspection Records for External Inspections
7.12 Piping Failure and Near-miss Reports
7.13 Deferral of Inspections, Tests, and Exam
7.14 Deferral of Inspect Repair Recommend Due Dates
-
8. Repairs, Alterations, and Rerating of Piping Systems
8.1 Repairs and Alterations
8.2 Welding and Hot Tapping
8.3 Rerating
8.1 Repairs and Alterations
8.2 Welding and Hot Tapping
8.3 Rerating
-
9. Inspection of Buried Piping
9.1 General
9.2 Frequency and Extent of Inspection
9.3 Repairs to Buried Piping Systems
9.4 Records
9.1 General
9.2 Frequency and Extent of Inspection
9.3 Repairs to Buried Piping Systems
9.4 Records
-
Create by Sub Lt. Metee JANMEEPONG
ASNT NDT Level III (284254)
[VT, PT, MT, UT, RT, ET]
MAKE IT STAND OUT
"This online Question and Answer platform is dedicated to sharing knowledge, guided by the principle of 'giving before receiving'."
(แพลตฟอร์มถาม-ตอบออนไลน์นี้อุทิศให้กับการแบ่งปันความรู้ โดยยึดหลักการ 'ให้ก่อนรับ')
"This resource may assist in the development of your NDT skills for future applications. It is currently available at no cost." (แหล่งข้อมูลนี้อาจช่วยในการพัฒนาทักษะ NDT ของคุณสำหรับการใช้งานในอนาคต ขณะนี้ยังไม่มีค่าใช้จ่าย)